Observing Time Request
Year:
Quarter:
January-March
April-June
July-September
October-December
Principal Investigator:
Names and Insititutions of co-investigators:
Title of Project
Project Abstract
Scheduling information:
Number of nights requested:
Minimum acceptable contiguous nights:
Preferred months/days:
Impossible dates:
Other constraints:
Is this a PhD thesis?
Filters required:
BVRI
Ha 6570
Ha 6650
Ha 6730
Observing requirements:
Number and kind of flatfields needed:
Sky conditions required:
Minimum acceptable seeing:
Number and type of standard star observations needed:
Average signal to noise desired:
List of objects:
Has time been allocated for this project at CPO before?
How many usable nights so far?
If there is or was time allocated on any other telescopes for this project, list which telescopes.
How many usable nights so far?
Status of data?
Scientific justification and feasibility:
attach one page