BF072D reduction notes: *** EVPA calibration still needed BF072D on 18 Aug 2004 = day 231 Array name = 'VLBA ' includes antennas: 1:BR 2:FD 3:HN 4:KP 5:LA 6:MK 7:NL 8:OV 9:PT 10:SC refant=2 had to move TECOR files to $HOME 5 GHz Step 1: VIPSPIPE 3C279 timer 0 21 23 40 0 21 25 10 for fringe-fit calsour '3c279','oq208','j1310+3220','J0854+2006','' interp 'ambg' Step 3: 2 strong sources didn't reach the thermal noise. Changed these into "E" code calibrators: 09785912 and 1645+410 used step3 models and then re-ran step 3. 15 GHz 3C279 timer 1 00 40 0 1 00 42 0 0 for fringe-fit Step 4: doitall Step 5: run and go step5 EVPA calibration based on questionable VLA monitoring data from August 9 and Sep 19 -- yuck. VLA measurements (converted to degrees) J0854 4860 70 -23 3C279* 480 -84 J1310* 10 12 J0854 15000 100 -28 3C279* 350 -40 J1310* 50 112 ; extrapolated with sm VLBA observables: J0854 4860 89 89 3C279 363 22 J1310 9 -54 corr 68 74 66 ; use +68 J0854* 15000 147 20 3C279 178 -60 J1310 61 -5 corr -48 20 -63 ; use -50 3C279 C4 at pixxy 139 121 is 79 degrees after all corrections at 5 GHz 3C279 C4 at pixxy 280 240 is 83 degrees after all corrections at 15 GHz SPLIT out *.TBC2 and reimage reload into AIPS with loadall, then do step5pall Analysis: 09785912 09825831 09826065 1642+393 1645+410 is polarized at 5 and 15 16903984 polarized at 15 GHz only